| Bramley Fall Stone supplied to Blackfriar Bridge Contract | |
![]() |
In April 2008, Network Rail awarded Balfour Beatty the contract to deliver Blackfriars Station and Bridge Reconstruction Scheme, a vital part of the £5.5 billion government funded Thameslink investment managed by Network Rail. Article Published: 11/09/2011 |
| Plant Hire Services & Aggregates supplied to Barhale | |
![]() |
As part of their ongoing commitment to improving flood defences, Yorkshire Water announced a series of works which involved the renovation of their Kirkstall Road pumping station and the rising of its water main. Mone Bros were appointed as a major supplier to the project, working closely with main contactor Barhale. Article Published: 11/09/2011 |
| Plant Hire & Waste Removal Services provided to Yorkshire Water | |
![]() |
As part of their ongoing commitment to improving the quality of water throughout the West Yorkshire region, Yorkshire Water announced in 2008 a series of renovations and improvement works at Graincliffe Reservoir and Water Treatment Works. Article Published: 11/09/2011 |
| Bramley Fall Stone supplied to Hull Docks Rennovation Project | |
![]() |
As part of their ongoing commitment to improving its sea defences, Hull City Council awarded Quibbel Construction with a project to provide construction works on the Sea Wall at Hull Docks. Article Published: 09/09/2011 |
| Yorkshire Stone supplied to Woodlesford Railway Station, Rothwell | |
![]() |
In 2009 Network Rail awarded a contract to C Spencer Ltd to install a new footbridge at Woodlesford Railway Station in Rothwell, to replace the old level crossing. The construction is part of a programme of works to remove crossings that have a history of misuse and, by permanently separating pedestrians and trains, improve safety. Article Published: 20/04/2011 |
| Recycled Type 1 supplied to Leeds M621 Construction Project | |
![]() |
In 2009 Balfour Beatty were awarded a contract to provide a range of reconstruction works between junctions 1 and 3 of the M621 near Leeds. The proposed works were to renew the existing steel central reserve safety barrier with a concrete step barrier. Also included was the reconstruction of drainage and pavement works within the central reservation. Article Published: 19/04/2011 |